Tote Bags

Lace Triangle Shoulder Bag

SPECIFICATIONS

Material
Lace
MOQ
From 300 pcs per design
Sample Time
5–7 working days
Bulk Lead Time
25–30 days after sample approval and deposit

AVAILABLE SIZE

39*22*32

Private LabelOEM Support

OEM / ODM PROCESS

From product brief to approved production.

  1. Share reference and requirements
  2. Confirm materials, logo and quotation
  3. Develop and approve the sample
  4. Produce, inspect and pack

Sample Time: 5–7 working days. Sample time starts after the design details, material, color and logo method are confirmed. Complex designs, specially sourced materials or multiple revisions may require additional sampling time.

Bulk Lead Time: 25–30 days after sample approval and deposit. Bulk production normally takes 25–30 days after sample approval, order confirmation and deposit receipt. Shipping time is not included and depends on the destination country and shipping method.

START A CUSTOM PROJECT

Let’s turn this direction into your product.

Send a reference image, estimated quantity and target market to begin.

Send Inquiry